Engstringerweg Farmhouse, Regensdorf

Following a fire, the house was renovated and converted into a two-unit apartment building. The ceilings had to be retrofitted to meet fire and sound insulation standards. The building envelope underwent partial energy-efficiency upgrades.

Facts and images
Construction Data
Involved
Fachwerkwände innen und aussen dominieren die konstruktive Durchbildung.
Fachwerkwände innen und aussen dominieren die konstruktive Durchbildung.
Bohlenwände als Bestandteil der Aussenwandkonstruktion.
Bohlenwände als Bestandteil der Aussenwandkonstruktion.
Konstruktiver Holzschutz hilft, das Fachwerk vor eindringender Feuchtigkeit zu schützen.
Konstruktiver Holzschutz hilft, das Fachwerk vor eindringender Feuchtigkeit zu schützen.
Die strassenseitige Fassade ist energetisch wie schallschutztechnisch ertüchtigt.
Die strassenseitige Fassade ist energetisch wie schallschutztechnisch ertüchtigt.

The Project
A fire in the tiled stove chimney necessitated the renovation of the farmhouse. At the same time, it was decided to convert the house from a single-family home into a multi-family residence. The newly renovated house is now used as a multi-family residence with two apartments and a guest room with its own bathroom. This conversion imposes higher requirements on the building components in terms of fire protection and sound insulation. The ceilings, in particular, had to be extensively reinforced to meet these new requirements. Since the building is located directly on the busy Affolternstrasse, additional requirements for airborne sound insulation against external noise sources had to be taken into account during the energy retrofit of the building envelope.

Construction Method
The ceilings of the farmhouse consist of wooden beam ceilings with sliding and strap floors. To meet fire resistance requirements and support the additional weight of the soundproofing fill, the beam ceiling was converted into a “solid wood ceiling.” The existing exterior walls (timber frame infilled with rubble stone masonry) were insulated on the inside. This involved installing a stud frame in front of the existing walls, which was filled with cellulose fiber insulation.

The Challenge
The existing exterior walls, constructed as timber-frame structures with rubble stone infill, required careful energy-efficient renovation. The goal was to prevent moisture from penetrating the structure over time.

Services of Timbatec

- SIA Phase 31 Preliminary Design

- SIA Phase 32 Construction Project

- SIA Phase 41 Tendering and Bid Comparison

- SIA Phase 51 Construction design

- Building physics design

- Specialized planning: Fire protection

- Structural Analysis and Design

Client
Sieber Edo
8105 Regensdorf

Client
BAUraum GmbH
8134 Adliswil

Timber construction
Frischknecht Holzbau Team
8302 Kloten

Photography
Cornelia Broggi