New Construction of Apartment Building A in Hüttlenen, Flühli

This four-story residential building, which contains nine apartments, features CLT ceilings and walls and offers a view of the mountains as an added bonus.

Facts and images
Construction Data
Involved
hochwertiger Innenausbau für die Mietwohnungen. Geschossdecken mit TS3 Technologie
hochwertiger Innenausbau für die Mietwohnungen. Geschossdecken mit TS3 Technologie
Durchlaufende TS3 Geschossplatten. Terrasse mit Sicht auf die prachtvolle Bergwelt des Entlebuchs
Durchlaufende TS3 Geschossplatten. Terrasse mit Sicht auf die prachtvolle Bergwelt des Entlebuchs
angenehmes, gesundes und warmes Raumklima dank massiver Holzbauweise
angenehmes, gesundes und warmes Raumklima dank massiver Holzbauweise
Ausbaustandard Nasszelle
Ausbaustandard Nasszelle
Innenaufnahme
Innenaufnahme

The Project
This new construction in Flühli, in the canton of Lucerne, comprises nine condominiums, including a spacious penthouse. The four-story timber structure now houses eight apartments and a spacious penthouse, all built to condominium standards. The building is characterized by its spacious living areas and a facade featuring large openings. The client is not only the building’s designer but also the timber builder and manufacturer of the cross-laminated timber. The entire project was optimized technically and economically in line with the production capabilities of cross-laminated timber and to maximize living space.

Construction Method
Everything above ground level, except for the stairwell, is made of wood. On the ground floor and the upper floors, the exterior and interior walls and floor slabs are constructed using solid cross-laminated timber (CLT). For the living areas with large spans and for the support slab on the penthouse floor, TS3 technology was used to enable construction without the need for joists.

The Challenge
Great attention was paid to developing details that would allow the high requirements for impact sound insulation to be met while keeping the CLT walls and floors visible. The selected construction details were validated through sound measurements.

Services of Timbatec

- SIA Phase 31 Preliminary project

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Execution project

- SIA Phase 52 Execution

- SIA Phase 53 Commissioning

- Statics and construction

- Specialist planning building physics

Client
, BAUREALIT GMBH
6173 Flühli

Architect
BAUREALIT GMBH
6173 Flühli

Timber construction
Sägerei Schmidiger AG
6173 Flühli LU

Photography
BAUREALIT GmbH